Let us Help you with you next ICT Project
Fun Promotions !!
No transport cost for all new customers
Already a customer? save points and win super prices.
Our Services
IT Infrastructure
Reliable IT Infrastructure, the core of your companyIT Infrastructure
From PC to Servers,
WiFi, Switches, Storage, vSAN
Virtualisation and much more,…
We manage, install and monitor your intire infrastructure
IT Support and Helpdesk
Your IT problems are our IT problemsIT Support and Helpdesk
Onsite: A technician will handle your problems onsite and solve all your IT problems and any question you may have?Online: Our helpdesk is always ready to solve your IT problem or answer your questions
Fixed price per month.
Security
We help you with the security of your network or companySecurity
Spamfilters, load balancers and web filters
From firewalls to antivirus
Professional Camera Security
Power Security with UPS Systems from Eaton and APC
Cloud Services
Your backup or Servers in the cloud. See all of our servicesCloud Services
Backup as a Service, Disaster recovery
Infrastructure as a Service with VMware or Azure
Office 365, Exchange hosting
Software as a Service
VDS Systems
Work towards your IT for tomorrow.
Deploy multiple VMs at the same time
I found a nice script to deploy multiple VMs at the same time on the VMware Community site. i adjusted it a lil bit to meet my needs and tested it on vSphere 6.0 Build 2997665 here is the script i Used thank you EKardinal
KEMP load balancer Exchange 2016
So I started to experiment with KEMP load balancer free edition, wich you can get here. Kemp has cool templates for a lot of services you need to configure. check out the templates here. So I needed a load balancer for my exchange 2016 servers DAG and I went to download the template "Core services: MAPI, SMTP and Unified HTTP/HTTPS" Log into your kemp load balancer and upload the template "Virtual Services - Manage Templates". click on "Add new Template" (Sorry for the Dutch language) once uploaded you will see the following templates Once you added your templates you can add your new virtual services. Click on "Add New" in the "Virtual Service menu". Fill in all the fields and select template "Exchange 2016 HTTPS offloaded" So after you added the template it creates 2 lines in "Virtual Services - View/modify Services". You can leave the Redirect line as it [...]
Exchange 2016 limits
Exchange 2016 limits. Some limits of exchange 2016 I gathered: (post comment if you find more) Memory Per Exchange Server Instance 96 GB (VMware best practice guide) Number of CPUs per Exchange Server Instance 24 (VMware best practice guide) Exchange Server 2016 Standard Edition – maximum of 5 mounted databases per server Exchange Server 2016 Enterprise Edition – maximum of 100 mounted databases per server Maximum size of Exchange Mailbox database is 16 TB (Microsoft recommends 2TB / mailbox database) DAGs can have up to 16 members, and each member is limited by the edition of Exchange Server 2016 that is installed
Projects
Hosted Exchange 2010 to 2013 (Multi tenant) with VMware vSphere 5.5
Project description
Preparation
This is an overview of the project and not a technical document how to migrate to Exchange 2013. In the past we setup a multi tenant environment with Exchange 2010. At that time there was only resources for 1 physical server, wich was sufficient at the time […]
IBM V3700 iSCSI and IBM System x3650 M4
Project description
The Lay-out
We chose this project because we could reduce the cost by selecting iSCSI over fiber
- The environment existed of a mix of Windows 2000, 2003 and 2008 servers.
- Big files and home folders of several GB to 4TB.
- The existing ERP Software had to keep working […]
Lenovo/IBM BladeCenter H
Project description
To be honest the racks were full of old server that havent been touch in over 10 to 15 years. So there were big HP server G2 and G4 generation among them, wich made it easy to reclaim so much rack space. Non the less its was […]









